PROJECTS

Below are examples of our consultants' previous projects.
Code Level 3. 10% Renewable Energy.
Code Level 3. 10% Renewable Energy.

This is the garden of a four dwelling, high-end development required to meet Code Level 3 with 10% of its energy produced from renewable sources. A log burner and photovoltaic (PV) panels were added to existing mains gas solution meet the renewable energy requirement. A strong focus was placed on ecology. Our consultant undertook SAP, Code and renewable energy calculations for planning condition sign off. Phase 1 has been fully certified Post Construction.

Masterplanning and Tender Documents
Masterplanning and Tender Documents

This site was the result of collaboration between a developer, contractor and architect as part of a tender process. Our consultant provided input to the masterplan to improve sustainability whilst controlling build costs, provided sample fabric specifications for the high code level (levels 4 and 5) designs to aid with pricing and wrote the Energy and Sustainability section of the tender document. The Energy and Sustainability section received the highest score awarded in the bid process.

Code for Sustainable Homes Level 4
Code for Sustainable Homes Level 4

This is one of two detached, high-end dwellings, required to meet Code Level 4. The requirement was not known until the planning condition was set and a Design Stage Certificate was required prior to commencement. Our consultant assisted with design alterations to enable a swift and successful assessment. PV panels and efficient fabric were added to a gas solution. A strong focus was placed on ecology and green roofs were incorporated. This site is fully certified Post Construction.

Code Level 3. 10% Renewable Energy.
Code Level 3. 10% Renewable Energy.

This is the garden of a four dwelling, high-end development required to meet Code Level 3 with 10% of its energy produced from renewable sources. A log burner and photovoltaic (PV) panels were added to existing mains gas solution meet the renewable energy requirement. A strong focus was placed on ecology. Our consultant undertook SAP, Code and renewable energy calculations for planning condition sign off. Phase 1 has been fully certified Post Construction.