Code Level 3. 10% Renewable Energy.

This is the garden of a four dwelling, high-end development required to meet Code Level 3 with 10% of its energy produced from renewable sources. A log burner and photovoltaic (PV) panels were added to existing mains gas solution meet the renewable energy requirement. A strong focus was placed on ecology. Our consultant undertook SAP, Code and renewable energy calculations for planning condition sign off. Phase 1 has been fully certified Post Construction.